Call: +(86) 137 7712 9988
Office Location:

​No.789 Xiaying Road, Ningbo, Zhejiang China

Leading Industry:

Power Line Tools

Leading Industrial:

In China

Cable laying pusher

Cable Feeder

Cable ladying pusher apply to reconstruction of urban power gird and new cable laying, especially for long-distance cable laying. It helps to reduce labor intensity and improve engineering quality.

​About E-Grid

​Ningbo Eastern Grid Power (E-Grid) is China leader in designing, manufacturing and supplying hydraulic brake tensioners for stringing operations, ideal to allow operations to be carried out with the highest accuracy, speed and safety.

Description
Order numberDiameter of suitable cable (mm)Linepull (kN)Motor power (kW)Dimensions(mm)Weight (kg)Remark
line speed (m/min)
rating
21101¦µ60-¦µ1203/6.50.75950¡Á500¡Á550165Up¨Cdown Configuration,crawler ,can,addauxiliary winch
21102¦µ60-¦µ1405/6.51.5945¡Á530¡Á600203Right and left Configuration crawler,,can add auxiliary winch
21103¦µ60-¦µ1505/6.52¡Á0.75920¡Á565¡Á540176V type configuration crawler
Application

This machine apply to reconstruction of urban power gird and new cable laying, especially for long-distance cable laying. It helps to reduce labor intensity and improve engineering quality.

Feature

1.This machine has big power, small size and light weight,easy to use in cable conduit.
2.The conveying wheel is made by rubber to avoid damage of cable’s skin. Besides, the center distance can be adjusted according to the outer diameter.
3.This series of cable elevator uses double engine and special crawler belt to convey cable. And it conducive to protecting the insulation shell of cables.
4.There is high and low adjustable rollers, the construction is extremely convenient.
5.Equipped with two-way control switch, can choose to forward or backward when laying cables When the faulty cable is found in the laying process, the faulty cable can be smoothly reversed.
6.Cable transmission electrical control system consists of Master control box, Subcontrol box, Power supply, Cable Reel and Cable elevator. Ensure that each machine is delivered synchronously to avoid damage to the cable.

21102
Cable laying pusher
21103
Cable laying pusher
21104
EasternGridPower-undergroundcables-21104
Introduction

In general, the first cable elevator should be about 15-30 meters away from reel elevator.

Cable-laying-pusher-01

When laying cables along a straight line, the distance of two cable elevator can’t exceed 50 meters and place one Cable Ground Roller every 3 meters to set up cable.

Cable-laying-pusher-02

When the cable turns, cable elevator placed on straight line.

Cable-laying-pusher-03

When cable enter in cable conduit, cable elevator placed as shown below.

Cable-laying-pusher-04

When the cable crosses the road, able elevator placed as shown below.

Cable-laying-pusher-05
Quality Control

We have the complete production equipments and professional production team to manage the whole process from production to packing shipment. All products will 100% test before delivery to ensure the quality.
​Remarks
We can supply all kinds of stringing equipment according to customers’ requirements.

Shipment

1. The machines will be shipped in container.
2. We will ship the products within one month normally after receiving the payment.
3. Stock is available for standard product.

Payment

​1. We accept T/T and L/C.
2. Please send swift copy of T/T if you arrange payment by T/T.
3. Please send us the L/C draft to us before issue L/C.

Why choose us

1. High quality and competitive price.
2. Leading and biggest manufacture for stringing equipment in China.
3. 25 years of production experience and more than 1000 customers in the country and abroad market. The machines have been sold to more than 20 countries.
4. Big stock condition for fast shipment.
5. Detailed pre-sales service and fast active after-sales service. Response within 12 hours after-sales service.

1. Reel elevator should loose manually to avoid cable’s damage.
2. Cable Ground Roller is required to be placed 1 meter before and after the cable elevator and raised a little bit to make the cable enter the machine in parallel . When the cable turns, cable elevator placed on straight line.
3. The roller of cable elevator should be adjusted to the appropriate height according to the cable diameter and open the crawler belt to place cable.
​4. After cable top crossing machine 1.5 meters, start machine, put cable into center of crawler belt then clamp the cable. The clamp force is adjusted, no slip between crawler belt and cable is suitable.